Bommarito Consulting LLC
ITC Oneida–Sabine Lake 345 kV · Act 30 route cost model · Read the report ↗
This simulator operates the cost model from Bommarito Consulting LLC's independent analysis of the proposed ITC Oneida–Sabine Lake 345 kV transmission line. It is a desk study based on publicly available data, applying standard public-domain geospatial and route-optimization methods to public regulatory datasets (ITC's own published route layers, FEMA, USFWS/USGS, Michigan EGLE, county parcel records, and the U.S. Census Bureau). Nothing here constitutes engineering design, professional engineering certification, legal advice, or a stamped siting study. Bommarito Consulting LLC prepared the underlying report at its own expense, without commission, contract, or grant from ITC, Burns & McDonnell, the MPSC, any landowner, or any party supporting or opposing the project.
The weightings you set here are yours. A ranking produced under custom weights is a what-if, not a finding of the report; the report's own result is the Act 30 (report default) preset. Data vintages, sources and the provenance chain for every number are listed in the Method tab and in the report's appendices.
The simulator is provided as is, without warranty of any kind. Use of this site is subject to the Bommarito Consulting LLC terms of use and privacy policy. Basemap © OpenFreeMap / OpenStreetMap contributors; elevation from USGS 3DEP and AWS Terrain Tiles.
Loading the model pack…